Quality inspection bench: inspectors testing a production batch in China
Free Tool · No credit card · Excel format

Free Inspection
Report Template

The fill-in report professional inspectors use for pre-shipment inspections in China — report header, AQL standard, the 6 checkpoints, defect log, photo index and a PASS/FAIL conclusion (ISO 2859-1).

Get the Free Excel Template

Fill it in 3 steps

1

Header & standard

Record the order, product, factory and the AQL values you are judging against (Critical 0 / Major 2.5 / Minor 4.0 by default).

2

Six checkpoints

Packaging, appearance, function, dimensions, quantity, labeling — mark each pass or fail with measured specifics, then log defects.

3

Defects & conclusion

Count defects by class and compare with Ac/Re: ≤ Ac passes, ≥ Re fails. Sign, attach photos, state the next action.

A report without numbers wins no claims

Most buyers lose money not because no inspection happened, but because the report was too vague to enforce. "Quality is good", "some minor scratches" and "looks acceptable" prove nothing when a container arrives wrong. A usable report records measured dimensions, defect counts by class, packaging and carton data, and a signed PASS/FAIL against AQL values agreed in the PO — so the factory cannot dispute the finding and the payment condition has a trigger.

What the template covers
Section What you record Why it matters
A · Report detailsReport no., date, client, supplier, factory addressIdentifies the inspection — no duplicates, no disputes
B · Order & productProduct, model, PO no., order qty, unit priceTies the report to a specific purchase
C · Inspection standardISO 2859-1, level II, AQL Critical/Major/MinorThe pass/fail rule — must match the PO
D · Quantity checkOrdered / produced / packed / sampled, Ac–ReCatches short shipment and shows the sample basis
E · 6 checkpointsPackaging, appearance, function, dimensions, quantity, labelingSame six checks professional agencies use
F · Defects & resultDefects by class vs Ac/Re, final PASS/CONDITION/FAIL, signatureThe enforceable conclusion
+ Defect LogEvery defect: checkpoint, description, severity, qty, photo refTurns a rejection into a concrete rework list
+ Photo IndexPhoto no., what it shows, linked defect, verdictEvidence, not opinion

Enforceable, not decorative

Measured values and defect counts — the format a supplier cannot argue with.

Ties to payment

A signed result is the trigger for releasing the balance — or for rework.

Photo-backed

Built-in photo index so evidence travels with the conclusion.

Sample size first, then the report

The report template tells you what to record. The AQL sampling table tells you how many units to inspect and how many defects are allowed for your batch size — that is the number that goes into section D of this report. Download both and you have the full inspection kit.

Get the Free AQL Sampling Table

Get the Inspection Report Template

Enter your email and the Excel file downloads immediately — report sheet, defect log, photo index and a how-to-use guide.

No spam. We only email about sourcing and QC — unsubscribe anytime.

Free quote

Get a pre-shipment inspection quote

Your figures are ready to send — reply within 12 hours with a factory price and a freight estimate. No obligation.

Your numbers

Inspection report questions

What should an inspection report contain?

Report and order identifiers, the inspection standard (ISO 2859-1) with AQL values, the sample size and Ac/Re numbers, results for the six checkpoints, a defect log with severity and quantity, photo evidence, and a signed final result.

What is the difference between Critical, Major and Minor defects?

Critical = safety or legal risk (one defect normally fails the batch). Major = the product does not work or does not meet spec, usually judged at AQL 2.5. Minor = cosmetic only, usually judged at AQL 4.0.

Can I refuse payment based on this report?

Yes — if the AQL values and the payment condition are written into the PO before production: balance released only after the goods pass a third-party pre-shipment inspection per ISO 2859-1 at the agreed AQL.

Do I need photos if the goods passed?

Yes — passing units, sample layout, packing and carton label. They prove the inspection happened and set a documented baseline for the next order.

What is the most common mistake in inspection reports?

Descriptions without measurements. "Quality is good" or "some minor scratches" is unenforceable. Record measured values, defect counts by class, carton weights and sample sizes so nothing can be disputed.

How long does a pre-shipment inspection take?

One inspector-day for a moderate order (report usually within 24 hours); two to three days for large orders or complex electronics with full function testing.

Go deeper into quality control

The template is the paperwork. These guides are how the inspection actually protects your order.

View all guides
Quality control burn-in test before shipping from China
Inspection

Pre-Shipment Inspection in China: Full Guide

What PSI covers, how AQL sampling works step by step, and what the report should show.

Read guide
China factory audit guide
Supplier Check

China Factory Audit: The Complete Guide

Verify a factory is real before you send a deposit — the red flags that catch fakes.

Read guide
Quality control burn-in test before shipping from China
Free Tool

Free AQL Sampling Table (Excel)

How many units to inspect and how many defects are allowed, by batch size — the numbers for section D.

Get the table
WhatsApp